House Set7 Pics
Pondering south wall beam tilt.
Setting in the top sill plate distance from the north wall edge. (28 feet).
The last custom beam for the basement south wall getting tied in to the wall.
A few more sill plates and we are ready to put in the main level floor joists.
Putting in a west wall rim joist.
The south wall rim joist finished.
Doug setting the marks for floor joist alignment.
Doug and Guruka measuring off the center beam floor joist marks.
Blocking the end gaps in the floor joists.
House Set8 Pics